Hewlett-Packard ML110 - ProLiant G5 2TB Storage Server NAS Installation Instructions

Download Installation instructions of HP ML110 - ProLiant G5 2TB Storage Server NAS Network Storage Server for Free or View it Online on All-Guides.com.

HP ML110 - ProLiant G5 2TB Storage Server NAS Installation instructions - Page 1
1
HP ML110 - ProLiant G5 2TB Storage Server NAS Installation instructions - Page 2
2
HP ML110 - ProLiant G5 2TB Storage Server NAS Installation instructions - Page 3
3
HP Rack Rail Kit installation
instructions
© Copyright 1999, 2008 Hewlett-Packard Development Company,
L.P.
First edition: February 2008
The information in this document is subject to change without notice.
www.hp.com
*464164-001*
Overview
This document contains instructions for installing HP rack rails into square
and round hole racks for HP 1U and 2U servers.
NOTE:
For more information on preparing the server for installation,
see the user guide that ships with the server.
Kit contents
Two rack rails (left and right)
Mounting hardware for square and round hole racks
Two tie wraps
NOTE:
If mounting the server into threaded hole or telco racks, please
see w
ww.racksolutions.com to purchase mounting hardware.
Important safety information
See the Important Safety Information document included with the server.
CAUTION:
Electrostatic discharge (ESD) can damage electronic
components. Be sure you are properly grounded (earthed)
before beginning any installation procedure.
Installation guidelines
This installation is to be performed by qualified individuals who have
knowledge of the procedures, precautions, and hazards associated with
equipment containing hazardous electrical circuits.
WARNING!
These rails, when installed, form only a shelf for the server to
rest on. The server is not attached to the rail by any other means.
Use extreme caution when pulling the server out from the rack;
it can slip and fall, causing damage to the server or injury. HP
is not responsible for any damage or injury caused by the
mishandling of the server.
Page 1