Hewlett-Packard 252663-B24 - PDU Power Distribution Strip Installation Instructions Manual

Download Installation instructions manual of HP 252663-B24 - PDU Power Distribution Strip Other for Free or View it Online on All-Guides.com.

HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 1
1
HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 2
2
HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 3
3
HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 4
4
HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 5
5
HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 6
6
HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 7
7
HP 252663-B24 - PDU Power Distribution Strip Installation instructions manual - Page 8
8
Installing the control unit in the rack
The control unit can be mounted in the rack two different ways,
depending on whether you install the 0U brackets (A) or the 1U
brackets (B) to the control unit.
Installing the control unit in a square-holed
rail
NOTE: Use the M6 screws and cage nuts that shipped
with the rack when installing in a square-holed rail.
Installing the control unit in a square- and
round-holed rail
NOTE: Use the sheet metal mounting screws that are
included with this kit when installing in a square- and
round-holed rail.
Installing the extension bars (if
included)
The cord retention brackets are shown for clarification in the
following diagrams, though installation of the cord retention brackets
is optional.
NOTE: Follow these same instructions when using a single-
wide extension bar bracket.