MAYTAG 23-11-2229N-005 User's Manual

Download Operation & user’s manual of Maytag 23-11-2229N-005 Air Conditioner for Free or View it Online on All-Guides.com.

Brand: Maytag

Category: Air Conditioner

Type: Operation & user’s manual for Maytag 23-11-2229N-005

Pages: 28

Download Maytag 23-11-2229N-005 Operation & user’s manual

Maytag 23-11-2229N-005 Operation & user’s manual - Page 1
1
Maytag 23-11-2229N-005 Operation & user’s manual - Page 2
2
Maytag 23-11-2229N-005 Operation & user’s manual - Page 3
3
Maytag 23-11-2229N-005 Operation & user’s manual - Page 4
4
Maytag 23-11-2229N-005 Operation & user’s manual - Page 5
5
Maytag 23-11-2229N-005 Operation & user’s manual - Page 6
6
Maytag 23-11-2229N-005 Operation & user’s manual - Page 7
7
Maytag 23-11-2229N-005 Operation & user’s manual - Page 8
8
Maytag 23-11-2229N-005 Operation & user’s manual - Page 9
9
Maytag 23-11-2229N-005 Operation & user’s manual - Page 10
10
Maytag 23-11-2229N-005 Operation & user’s manual - Page 11
11
Maytag 23-11-2229N-005 Operation & user’s manual - Page 12
12
Maytag 23-11-2229N-005 Operation & user’s manual - Page 13
13
Maytag 23-11-2229N-005 Operation & user’s manual - Page 14
14
Maytag 23-11-2229N-005 Operation & user’s manual - Page 15
15
Maytag 23-11-2229N-005 Operation & user’s manual - Page 16
16
Maytag 23-11-2229N-005 Operation & user’s manual - Page 17
17
Maytag 23-11-2229N-005 Operation & user’s manual - Page 18
18
Maytag 23-11-2229N-005 Operation & user’s manual - Page 19
19
Maytag 23-11-2229N-005 Operation & user’s manual - Page 20
20
Maytag 23-11-2229N-005 Operation & user’s manual - Page 21
21
Maytag 23-11-2229N-005 Operation & user’s manual - Page 22
22
Maytag 23-11-2229N-005 Operation & user’s manual - Page 23
23
Maytag 23-11-2229N-005 Operation & user’s manual - Page 24
24
Maytag 23-11-2229N-005 Operation & user’s manual - Page 25
25
Maytag 23-11-2229N-005 Operation & user’s manual - Page 26
26
Maytag 23-11-2229N-005 Operation & user’s manual - Page 27
27
Maytag 23-11-2229N-005 Operation & user’s manual - Page 28
28
®@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@@
Installing Cabinet in
Minimum Width Window
"1, Remove filler panels on air conditioner cabinet.
2. Refer to steps 1 through 3 of Window Installation instructions.
3. Close window until it touches behind air conditioner top bar.
4. Fasten top bar to window frame using 5/8" washer head screw.
5. If filler is required on sides of air conditioner, cut plastic foam seal
to size and fill both sides.
6. Use silicone or latex sealant (not supplied to fill any minor openings.
7. Install chassis into cabinet.
Consult your authorized dealer or importer for alternative
installation instructions.
Through-the-wall Installation
This air conditioner is designed as a slide-out type chassis, making it
possible to install it through-the-wall in both existing and new
construction. We recommend that this type of installation be performed
with professional assistance.
IMPORTANT: This appliance must be installed according to all
applicable electrical and building codes and ordinances.
It is recommended that you have help to install your unit and that you
use proper lifting technique to avoid personal injury.
It is important that you inspect the condition of the wall where the air
conditioner will be installed.
Be sure the wall can support the weight of the unit.
All cabinet louvers MUST BE on the outdoor side of the wall. DO NOT
BLOCK SIDE LOUVERS.
The cabinet must be installed level from side-to-side and with a
downward tilt from inside to outside.
"1, First remove the Decorative front panel and chassis from the cabinet,
then remove top bar from the cabinet.
2=
Determine the size of the opening for a wood frame by adding 1/8"
to the width and height of the cabinet. Measure height from top of
cabinet to bottom of bar. Add this measurement to the thickness of
wood used to build the frame. This will determine the size of wall
opening needed. Minimum 1" thick lumber is recommended when
building the frame. When determining finish frame thickness, be sure
not to cover side louvers on the cabinet.
:3. Install the finished frame in the wall opening square and level, nail
or screw it securely to the wall and place the cabinet into the framed
wall opening.
4, Make sure cabinet projects into the roomside of the wall 1 1/4" at
the top and 1 1/2" at the bottom to ensure proper tilt and access to
the anti-theft screw, then fasten cabinet to the frame by drilling
twelve (12) 1" wood screws (not supplied) through the cabinet and
into the frame. (Fig. 1 &2)
If installation is made in a building with brick veneer construction, a
steel angle lintel must be used to support the bricks above the
cabinet.(Fig.3)
5=
Install a 3/4" X 1 1/2" wood filler strip between the bottom bar and
the interior, caulk both top and bottom of this strip. After cabinet is
installed caulk all openings, inside and outside between finish frame
and cabinet to prevent moisture from getting to the interior of the
wall. Use of flashing (driprail) will further prevent water from
dripping inside the wall.
6. Install chassis into cabinet.
5
(_ Top Bar C) Attach top bar here
Fig. 1
Fig. 2
Fig. 3
C) Wood frame
C) 1" wood screws
C) Cabinet
(_ Bottom Bar
(_ Interior wall
(_ Decorative Front
C) Minimum lx6 wood
support (nailed or
screwed to wood
frame)
(_2" Wood frame
(_1 1/2" space
C)1 1/4" space
C)Brick veneer
(_Lintel angle
(_Caulking
C)Flashing (drip rail)
C)Side louvers
(_Wood filler strip