ACV 60 N Installation Manual

Download Installation manual of ACV 100 N Boiler for Free or View it Online on All-Guides.com. This version of ACV 100 N Manual compatible with such list of devices, as: 100 N, 150 Jumbo, 60 N, 70 N

Brand: ACV

Category: Boiler

Type: Installation manual

Model: ACV 100 N , ACV 150 Jumbo , ACV 60 N , ACV 70 N

Pages: 6 (0.48 Mb)

Download ACV 100 N Installation manual

ACV 100 N Installation manual - Page 1
1
ACV 100 N Installation manual - Page 2
2
ACV 100 N Installation manual - Page 3
3
ACV 100 N Installation manual - Page 4
4
ACV 100 N Installation manual - Page 5
5
ACV 100 N Installation manual - Page 6
6
8
BOILER ROOM
Important
•Keep vents free at all times.
Do not store inflammable products in the boiler room.
Do not store corrosive products near the boiler, such as paints,
solvents, chlorine, salt, soap and other cleaning products.
If you smell gas, do not switch on the light or light a flame.Turn off
the mains gas tap at the meter and inform the appropriate
services immediately.
Access
The boiler room must be large enough to allow good access to the
boiler.The following minimum distances are required around the boiler:
- front 500 mm
- side 100 mm
- behind 150 mm
- above 700 mm
Ventilation
The boiler room must be fitted with top and bottom vents sized
according to the table below or to current regulations.
The table below gives an example conforming to the Belgian standards.
Other countries should refer to their own standards.
Base
The base on which the boiler rests must be made of non-combustible
materials.
CHIMNEY CONNECTIONS
IMPORTANT
Boilers must be installed by an approved heating
engineer, in accordance with the prevailing local
standards and regulations.
Flue size should not be less then the outlet size of the
boiler.
Chimney connection type: B23
The boiler is connected to the chimney by a metal pipe rising at an
angle from the boiler to the chimney.
A flue disconnection piece is required.
This must be easy to remove to give access to the flue pipes when
servicing the boiler.
Note:
Regulations vary from country to country therefore
the table above is intended only as a guide.
Due to the high efficiency of our boilers, the flue gasses
exit at low temperature. Accordingly, there is risk that
the flue gasses could condense, which could damage
the chimney. In order to avoid this risk, it is strongly
recommended that the chimney be lined.
INSTALLATION
Ventilation 60 N 70 N 100 N 150
Jumbo
Min. fresh air
requirement m
3
/h 126 126 194 278
Bottom dm
2
2.11 2.11 3.20 4.8
Top dm
2
2.0 2.0 2.0 2.0
Chimney 60 N 70 N 100 N 150
minimum flue diameter Jumbo
E = 5 m Ø F min. mm 189 189 234 286
E = 10 m Ø F min. mm 159 159 178 250
E = 15 m Ø F min. mm 150 150 150 250
A
B
F
D
C
E
A. Top vent
B. Bottom vent
C. Draught regulator
D. Inspection window
E. Height of lined chimney
F. Chimney diameter